Abstract: Once carbon residue in a thermal oil system passes 1.5%, GB 24747-2023 puts the oil in the "stop service" band and the oil has to be replaced. Whether the furnace tubes also need a separate shutdown clean is a different question with different evidence. This article separates the two decisions, then sets out the temperature ceiling and flash-point rule for a cold solvent circulation, how flush oil is graded and reused, the three lines of residual acceptance before fresh oil goes in, and why a 350 system cannot simply copy the man-hours quoted for a 320 system. Site-specific lab values and records are left to be confirmed.

FREE TOOL · DIAGNOSIS
🛠 Scale Risk Diagnostic
Score deposit risk and energy loss by equipment, material, deposit type and thickness; export a PDF report
Run free diagnosis →
Free · result in 1 minute
FREE TOOL · MAINTENANCE
📅 Cleaning Cycle Estimator
Estimate the cleaning interval from equipment type, water hardness and operating temperature; export a PDF plan
Estimate the cycle →
Free · result in 10 seconds

1. Two decisions, not one: the carbon residue limit and the coke layer

Whether to clean, and whether to change oil first, cannot be settled by looking at oil colour. GB 24747-2023 Safety technical conditions for organic heat transfer fluids sets three quality bands: permitted in service, safety warning, and stop service. Carbon residue at 1.5% or above falls into the stop-service band, so the oil must be drained and replaced. That limit governs the fluid, not the tube wall.

Furnace-tube coking is a separate condition. How thick the coke is, where it sits and whether it has blocked a tube cannot be read from an oil sample; it needs operating data plus a borescope. Before shutdown, sample the oil for carbon residue, acid value, kinematic viscosity and flash point, and inspect the tube bore at the high-flux sections, the return bends and the headers, [TO BE CONFIRMED: oil analysis sheet and borescope records].

What is judgedEvidence usedAction once the limit is passedLink to the other decision
The thermal oilCarbon residue 1.5%, viscosity, flash pointStop service, drain and replaceNew oil is not a tube clean
Tube-side cokeCoke thickness, coverage, in/out temperature difference, furnace temperatureShutdown clean when heat transfer or flow is affectedCleaning is the step before refilling
Both over the limitResidue over 1.5% and a thick coke layerClean first, refill afterwardsReverse the order and the clean is wasted

Collapsing both into "residue is over the line, bring the unit down and clean" is where jobs go wrong: a thin layer means an oil change is enough, while a thick layer with a widening temperature difference means cleaning comes first even if residue has only just passed 1.5%, [TO BE CONFIRMED: measured coke thickness and temperature-difference data].

2. Which comes first: standard wording leaves little room

GB 24747-2023 clause 10.1 sets the sequence: when the fluid is heavily contaminated, when carbon residue or kinematic viscosity reaches the stop-service band, after a tube overheating incident, or before any fluid change, the boiler and system are inspected first; where deposits or coking are present and the cleaning conditions of GB/T 34352-2017 Cleaning guide for the boiler and system with organic heat transfer fluids are met, the deposits and coke are removed so the incoming fluid is not contaminated.

The common failure is doing it the other way round: drain, refill, then watch the new oil darken within a month or two and start hunting for a cause. Coke on the wall and residual cleaning agent both accelerate oxidation of the fresh charge, and the new oil takes the blame for the old one's deposits.

With the order fixed, three items belong in the cleaning plan: total fluid inventory (it sets solvent volume and the number of flush passes), the pre-clean oil test data (it sets chemistry and man-hours), and the presence of any blockage or leak (it decides whether flow is restored before cleaning). A quote that omits them leaves the risk on site, [TO BE CONFIRMED: system inventory and pre-clean oil data].

3. Cold solvent circulation: temperature ceiling and a measured flash point

This is a shutdown clean with solvent circulating cold, with no heating at any stage. GB/T 34352-2017 clause 5.2.3 requires that the temperature of an organic cleaning agent used for shutdown cleaning generally not exceed the boiler's normal inlet temperature during service. On that basis our plan holds the liquid below 40°C and refuses heating as a way to save time.

Heating buys risk, not speed. Warmer solvent volatilises faster, the flash point of the working liquid drops, and residual oil oxidises faster; the mixing tank and the high-point vents are where that shows up. The flash point of the working liquid must be measured, never calculated from the mix ratio — a calculated figure is a paper number, the measured open-cup value is what the crew actually faces, [TO BE CONFIRMED: measured flash point of the working liquid].

Compatibility is settled by a bench test before anything is charged. Seals should be FKM or PTFE; ordinary rubber can swell, soften or crumble, and a failed seal means leaks and solvent migration into the expansion tank at the same time. Where stainless heat exchangers are in the loop, chloride in the cleaning liquid is held at or below 25 mg/L per clause 5.2.6, and corrosion rate is confirmed at or below 0.1 mm/a per clause 5.2.1, separately for each material present, [TO BE CONFIRMED: seal material list and bench test result].

Agent composition and dosage are not fixed here; they follow the coke analysis and the bench dissolution result, with the record filed before scale-up.

4. Running the circulation: direction, filtration and monitoring

The main wash runs in a closed loop: mixing tank, circulation pump, filters and temporary piping, with the liquid routed through every tube and exchanger in the design direction. A clean-water trial circulation comes first, checking joints, flanges and pump seals for leaks and recording the no-load flow as the baseline for spotting a blocked screen.

The direction is reversed once mid-wash so the high-flux sections and return bends — where velocity is lowest — also see fresh solvent. Single-direction circulation lets coke particles settle there as secondary deposit that no sample will show until the unit is opened.

The filter is the weakest point of this stage. Dislodged coke and sludge blind a screen quickly; flow falls, pump discharge pressure climbs and cleaning efficiency drops at once. Screens are cleaned or changed on schedule, with time, screen mesh and what was caught written down; when reused solvent is charged back, the suction line carries a screen of at least 60 mesh (clause 5.5.5) so debris cannot enter the tubes, [TO BE CONFIRMED: filter cleaning and replacement log].

The end point is a sampling result, not a clock: no further rise in suspended matter, a stabilised inlet/outlet temperature difference, and flow that holds with a clean screen — all three, before the flush stage starts, [TO BE CONFIRMED: sampling frequency and temperature-difference log].

5. Flushing and residues: three lines of acceptance

The main wash ends by draining the spent solvent. Spent liquid, filter sludge and oil sludge go as hazardous waste with a transfer manifest, and the disposal contractor and quantity are filed; discharge to stormwater or the municipal sewer is ruled out in the plan itself, [TO BE CONFIRMED: waste manifest and disposal quantity].

Flushing follows: the system is filled to its working volume with flush oil and circulated to carry out residual solvent and suspended coke. Flush oil is not scrapped outright; it is settled, filtered and reused as working stock, graded downwards as it loads up. GB/T 34352-2017 clause 5.2.4 sets the reuse limits: for boilers with a maximum working temperature below 280°C, part of the organic cleaning agent used in a shutdown clean may be reused, provided it is treated to a carbon residue below 0.5% and the reused quantity generally does not exceed 50% of the total charge. Those are conditions, not suggestions.

GradeCriterionWhere it goes
Grade 1 (fresh)Unused, or clear after settling and filtration with no visible solidsMain wash and first flush
Grade 2 (reuse)Treated to carbon residue below 0.5%, reuse capped at 50% of the chargeLater flush passes
Grade 3 (downgraded)Heavy coke load, still turbid after settlingNo further reuse; to hazardous waste with the route recorded

Three acceptance lines, none optional. First, mechanical drainage: low-point drains, return bends, headers and the end of the return main are each drained; circulating without draining the low points leaves liquid in the bends that never gets exchanged. Second, flush displacement: circulation until sampling passes, judged on appearance, suspended solids and carbon residue returning to near-fresh levels. Third, boil-out after start-up: a slow ramp removes low boilers, followed by ten consecutive days of oil sampling, [TO BE CONFIRMED: line-by-line acceptance records and the ten-day sample set].

Each line answers a different problem: drainage removes what has pooled, displacement removes what clings to walls and dead legs, boil-out removes low boilers and moisture dissolved in the oil. GB/T 34352-2017 clause 4.1.1 requires that essentially no cleaning agent remains and that the refilled fluid is not contaminated — the three lines are how that clause is met on site. Skip one and the residue oxidises the new charge.

6. Grades 320 and 350: both cleanable, compatibility retested

Systems running 320 or 350 grade oil can both be cleaned by cold solvent circulation; the grade is not a barrier, and the 40°C ceiling and the no-heating rule apply equally. What differs is man-hours and compatibility, not the process route.

Man-hours cannot be copied. A 350 system usually carries denser, more carbonised coke, so a bench soak and strip-time test on the deposit comes first and sets the number of passes and hours; quoting the 320 figure produces either an under-cleaned system or wasted solvent, [TO BE CONFIRMED: 350 system soak and strip-time record].

Compatibility is retested with the actual oil in that system, never with fresh oil or another unit's sample. Two tests: a blend-and-filter test with the residual oil, watching for floc, sediment or abnormal filter resistance; and a compatibility test against the oil to be charged, confirming no layering, haze or viscosity jump. Both pass before the plan and man-hours are fixed, and the reports go into the acceptance file, [TO BE CONFIRMED: blend/filter and compatibility test reports].

Start-up follows a slow ramp while watching oil temperature, oil pressure and tube-wall temperature. A wall temperature climbing faster than the oil means localised coke or uneven flow distribution, so the ramp stops for investigation. The first operating cycle after start-up gets extra rounds, with the three temperatures logged into a trend curve; that curve, not a fixed calendar interval, is what sets the next cleaning.

FAQ

Carbon residue is above 1.5% — does the unit have to come down now?

The oil has to be changed, but a shutdown clean is a separate call. Carbon residue above 1.5% puts the oil in the stop-service band of GB 24747-2023, so it cannot stay in the system; whether the tubes also need cleaning depends on the coke layer. Open the headers or run a borescope, read the layer thickness against the inlet/outlet temperature difference and the furnace temperature, then decide: thin layer with degraded oil means drain and refill, thick layer affecting heat transfer means clean during the same shutdown.

Why not heat the solvent circulation to finish faster?

Because heat adds risk rather than speed. GB/T 34352-2017 clause 5.2.3 keeps shutdown cleaning at or below the boiler's normal inlet temperature, and our plan holds the liquid under 40°C. Warmer solvent volatilises, the flash point of the working liquid falls and residual oil oxidises faster. Flash point is measured, never calculated. The way to save time is reversing circulation direction and keeping the screens clear.

Can flush oil be used as fresh charge after one pass?

No. Flush oil carries residual cleaning agent and suspended coke, so it stays a working stock: settled, filtered, reused, and graded downwards with the route recorded. Clause 5.2.4 allows reuse only after treatment to a carbon residue below 0.5%, capped at 50% of the total charge. Fresh oil goes in after all three acceptance lines — drainage, flush to a passing sample, boil-out plus ten days of sampling.

Can a 350 synthetic system copy the plan written for a 320 unit?

The process transfers, the man-hours do not. Grade is not a barrier and the same 40°C ceiling applies; but a 350 system needs the bench soak and strip-time test to set hours, and compatibility must be retested with that system's own oil, including a blend-and-filter test with the residual oil and a compatibility test against the incoming charge.

What happens if the oil is changed without cleaning the tubes?

The new charge inherits the coke layer and the residual liquid. Clause 10.1 of GB 24747-2023 requires an inspection before any fluid change and cleaning when the deposits meet the GB/T 34352 conditions; skip it and carbon residue climbs again within a cycle or two, so the operator pays for the oil twice and for a second shutdown.

Related reading

Judgement criteria in this article come from GB 24747-2023 Safety technical conditions for organic heat transfer fluids (three quality bands on carbon residue, viscosity and flash point; clause 10.1 on inspection before a fluid change) and GB/T 34352-2017 Cleaning guide for the boiler and system with organic heat transfer fluids (clauses 5.2.1 corrosion rate, 5.2.3 shutdown cleaning temperature, 5.2.4 reuse of cleaning agent, 5.2.6 chloride limit, 5.5.5 suction screen, 4.1.1 residue requirement). Boiler type, oil grade and coke measurements are taken from the site lab sheet and inspection records; items marked to be confirmed will be completed when those records are available.

Thermal oil coking · deciding between oil change and cleaning

📞 +86 18952832843

Danyang Blue Star Anti-corrosion Cleaning Co., Ltd. · member of the China Industrial Cleaning Association
Address: 98 Hongjiadai, Picheng, Danbei Town, Danyang, Jiangsu, China

Service coverage: Jiangsu (Nanjing, Suzhou, Wuxi, Changzhou, Zhenjiang, Yangzhou) · Zhejiang (Hangzhou, Ningbo) · Shanghai · Anhui · Shandong · Henan

© 2026 Danyang Blue Star Anti-corrosion Cleaning Co., Ltd. | Source: www.lanxingqingxi.com